ES.R-Mgmt.

Holger Kursawe, Founder (2009)
Interim Management
Graduate Business Engineer ME (UAS)

Competence

Technical. Economical. Management. HR Mgmt.

 

Strengths

Experienced Project Leader. High Efficency. Pragmatic.

Target oriented. Flexible. Structured. Strategical. Analytical. 

 

Philosophy

Win-Win.   |   Smart and Simple.   |   Your Added Value.

Partner. Team Spirit. Transparency. Customer Satisfaction. Profitability.

Previous Commissions

Ø 15
Employees

Ø 38 Mio.
R&D / Invest.

✓
Productivity

✓
Profit Margin

Projects ( Contract / Participation )

Project Leader, E-Mobility

VAF GmbH, BMW AG, D-Bopfingen / A-Speyr

Project:   Development & Production of a Powertrain Assembly-Line

System Type: BMW GEN6_Line 5 – Gear Assembly-Line, Final Assembly-Line / Wedding E-Motor

 

Goals:     Planning ✓ Realization ✓ Drive ✓ Maturity Degree ✓ Q-Gates ✓ Profitability ✓

Trades:    Development, Industrialization, Production, Assembly/Commissioning, Relocation,

               Testing/Acceptance

Process:  Automation, Robotics, Control Technology, Mechanics, Sensors, Test Engineering

Scope:    25 Automatic Stations, 32 Robots, 41 Manual Workstations, Materials Handling,

               Workpiece Carrier, Elevators (3 Floors), GSC-Standard, Virtuelle IBN, Coman

 

https://www.vaf-bopfingen.de/index.php/de/produkte/neuanlagen

Project Leader, Troubleshooting

Reinhardt-Technik GmbH, Special Mechanical Engineering, Kierspe

Products: Industrial Plants, Process Automation (Bonding, Sealing and Encapsulation)

 

Goals:     Safeguarding PMgmt. ✓  Multi PMgmt. ✓  Drive Projects ✓  Profit Margin ✓ 

Phase:    Pre-Development, Development, Industrialization, Production/Assembly

Machine Type:  Conti Flow Robot, VecDos eTwin, Visco Star Plus, LSR eTwin Connect

 

https://www.reinhardt-technik.com/de/kernkompetenzen/segmente/

Project Leader, Troubleshooting

Irsingshausen GmbH, Daimler AG, Lemgo

Product: Total Seats (R&D Plastic Comp. / Covers, Assembly Total Seat)

 

Goals:    Planning ✓  Drive ✓  Delivery Ability ✓  Q-Dates ✓

Phase:   Development / Industrialization, Pre-Series

Model:  Daimler VS30

 

https://www.isri.com/

Project Leader, Troubleshooting

Hella-Innenleuchten GmbH / Volkswagen AG, Wembach
Products: ambient Innerlight, Door Warning Lights

 

Goals:   Maturity Level ✓  Delivery Ability ✓  Q-Dates ✓  Productivity ✓  P-Margin ✓

Phase:   Development / Industrialization, Pre-Series, Ramp-up

Model:  VW Touareg, Passat B8, Golf 7

 

https://www.hella.com/hella-com/de/Innenbeleuchtung-2517.html

Resident, Consulting (Technical, Strategic)

Hella-Innenleuchten GmbH / Audi AG, Wolfsburg
Produkt: Overhead Console

 

Goals:    Consulting ✓  Coordination ✓  Drive ✓  Mediation ✓

Phase:   Pre-Development

Model:  Audi A8 / D5, VW Phaeton

 

https://www.hella.com/hella-com/de/Innenbeleuchtung-2517.html

Resident, Consulting (Technical, Strategic)

Hella-Innenleuchten GmbH / Volkswagen AG, Wolfsburg
Product: ambient Innerlight

 

Goals:    Consulting ✓  Coordination ✓  Drive ✓  Mediation ✓

Phase:   Development, Industrialization, Pre-Series, Series

Model:  VW Touareg, Passat B8, Golf 7

 

https://www.hella.com/hella-com/de/Innenbeleuchtung-2517.html

Project Leader

Behr-Hella Thermocontrol GmbH, Porsche AG, Lippstadt
Product: Climate Control Devices

 

Goals:   Planning ✓  Facelift ✓  Optimization ✓  Productivity ✓  Profit Margin ✓

Phase:   Series

Model:  Porsche Panamera, Porsche Cayenne

 

https://www.bhtc.com/de

Project Leader

Behr-Hella Thermocontrol GmbH, BMW AG, Lippstadt
Products: Audio-/Climate Control Devices

 

Goals:    Maturity Level ✓  Delivery Ability ✓  Q-Dates ✓

Phase:   Entwicklung, Industrialisierung

Model:  BMW Mini

 

https://www.bhtc.com/de

Project Leader

BOA BKT GmbH, Daimler, Stutensee
Product: Turbo Exhaust Recirculation Pipes

 

Ziele:     Feasibility ✓  Maturity Level ✓  Delivery Ability ✓  Q-Dates ✓

Phase:   Pre- / Development, Industrialization

Model: Daimler S-/C-Class (M276 Engine Series) 

 

https://www.boagroup.com/de/

Project Leader

BOA BKT GmbH, BMW AG, Stutensee
Products: De-Coupler Components Exhaust System

 

Phase:   Pre- / Development

Model:  BMW, Faurecia

 

https://www.boagroup.com/de/

Key Account Manager

Harvey Nash GmbH, Ludwigsburg
Contracting IT- / Engineering Projects

 

https://www.harveynash.de/

Development Engineer

Lear Corporation GmbH & Co. KG, Volkswagen AG, Rietberg
Product Development, Seats, VW T5

https://www.lear.com/

Development Engineer

Innoplan GmbH, Bielefeld
Product Development, Rail Systems, Door-Flap Fixture


https://www.inno-plan.de/

Tool Mechanic

Peter Schubert GmbH, Hille
Tool Manufacture, Injection Molding Tools

https://www.schubert-wzb.de/

Tool Mechanic

Heinz Schwarz GmbH, Pr. Oldendorf
Large Toolmaking, Deep Drawing Tools

https://www.schwarz-werkzeugbau.de/

Projects ( Contract / Participation )

Project Leader, E-Mobility

VAF GmbH, BMW AG, D-Bopfingen / A-Speyr


Project:   Development & Production of a Powertrain Assembly-Line

 

System Type: BMW GEN6_Line 5 – Gear Assembly-Line, Final Assembly-Line / Wedding E-Motor

 

Goals:     Planning ✓ Realization ✓ Drive ✓ 

                 Maturity Degree ✓ Q-Gates ✓ Profitability ✓

 

Trades:   Development, Industrialization, Production,                     Assembly/Commissioning, Relocation,

                 Testing/Acceptance


Process: Automation, Robotics, Control Technology,                     Mechanics, Sensors, Test Engineering

 

Scope:    25 Automatic Stations, 32 Robots,                                     41 Manual Workstations,                                                     Materials Handling, Workpiece Carrier,                             Elevators (3 Floors)

 

https://www.vaf-bopfingen.de/index.php/de/produkte/neuanlagen

Project Leader

Reinhardt-Technik GmbH, Special Mechanical Engineering, Kierspe

 

Products: Industrial Plants, Process Automation (Bonding, Sealing and Encapsulation)

 

Goals:     Safeguarding PMgmt. ✓         

                 Multi PMgmt. ✓  

                 Drive Projects ✓  

                 Profit Margin ✓ 

Phase:    Pre-Development, Development, 

                 Industrialization, Production/Assembly

Machine Type:  Conti Flow Robot, VecDos eTwin, 

                             Visco Star Plus, LSR eTwin Connect

 

https://www.reinhardt-technik.com/de/kernkompetenzen/segmente/

Project Leader, Troubleshooting

Irsingshausen GmbH, Daimler AG, Lemgo

 

Product: Total Seats (R&D Plastic Comp. / Covers, Assembly Total Seat)

 

Goals:    Planning ✓ 

                Drive ✓  

                Delivery Ability ✓  

                Q-Dates ✓

Phase:   Development / Industrialization, 

                Pre-Series

Model:   Daimler VS30

 

https://www.isri.com/  

Project Leader, Troubleshooting

Hella-Innenleuchten GmbH / Volkswagen AG, Wembach

Products: ambient Innerlight, Door Lights

 

Goals:    Maturity Level ✓  

                Delivery Ability ✓  

                Q-Dates ✓  

                Productivity ✓  

                Profit Margin ✓

Phase:   Development / Industrialization,  

                Pre-Series, Ramp-up

Model:   VW Touareg, Passat B8, Golf 7

 

https://www.hella.com/hella-com/de/Innenbeleuchtung-2517.html 

Resident, Consulting (Technical, Strategic)

Hella-Innenleuchten GmbH / Audi AG, Wolfsburg

 

Produkt: Overhead Console

 

Goals:    Consulting ✓  

                Coordination ✓  

                Drive ✓  

                Mediation ✓

Phase:   Pre-Development

Model:   Audi A8 / D5, VW Phaeton

 

https://www.hella.com/hella-com/de/Innenbeleuchtung-2517.html

Resident, Consulting (Technical, Strategic)

Hella-Innenleuchten GmbH / Volkswagen AG, Wolfsburg

Product: ambient Innerlight

 

Goals:    Consulting ✓  

                Coordination ✓  

                Drive ✓  

                Mediation ✓

Phase:   Development, Industrialization, 

                Pre-Series, Series

Model:   VW Touareg, Passat B8, Golf 7

 

https://www.hella.com/hella-com/de/Innenbeleuchtung-2517.html

Project Leader

Behr-Hella Thermocontrol GmbH, Porsche AG, Lippstadt


Product: Climate Control Devices


Goals:    Planning ✓

                Facelift ✓

                Optimization ✓

            Productivity ✓

            Profit Margin ✓

Phase:   Series

Model:   Porsche Panamera / Cayenne

 

https://www.bhtc.com/de

Project Leader

Behr-Hella Thermocontrol GmbH, BMW AG, Lippstadt

Products: Audio-/Climate Control Devices

 

Goals:    Maturity Level ✓

                Delivery Ability ✓

                Q-Dates ✓

Phase:   Entwicklung, Industrialisierung

Model:   BMW Mini

 

https://www.bhtc.com/de

Project Leader

BOA BKT GmbH, Daimler, Stutensee

 

Product: Turbo Exhaust Recirculation Pipes

 

Ziele:     Feasibility ✓

               Maturity Level ✓

               Delivery Ability ✓  

               Q-Dates ✓

Phase:   Pre- / Development, 

                Industrialization

Model:   Daimler S-/C-Class 

                (M276 Engine Series) 

 

https://www.boagroup.com/de/

Project Leader

BOA BKT GmbH, BMW AG, Stutensee

 

Product: De-Coupler Components Exhaust System

 

 

Phase:   Pre- / Development

Model:   BMW, Faurecia

 

https://www.boagroup.com/de/

Key Account Manager

Harvey Nash GmbH, Ludwigsburg
Contracting IT- / Engineering Projects

 

https://www.harveynash.de/

Development Engineer

Lear Corporation GmbH & Co. KG, Volkswagen AG, Rietberg
Product Development, Seats, VW T5

https://www.lear.com/

Development Engineer

Innoplan GmbH, Bielefeld
Product Development, Rail Systems, Door-Flap Fixture


https://www.inno-plan.de/

Tool Mechanic

Peter Schubert GmbH, Hille
Tool Manufacture, Injection Molding Tools

https://www.schubert-wzb.de/

Tool Mechanic

Heinz Schwarz GmbH, Pr. Oldendorf
Large Toolmaking, Deep Drawing Tools

https://www.schwarz-werkzeugbau.de/